SABIHA GOKCEN AIRPORT SECOND RUNWAY FIRST PHASE

  • Picture1 (2)
    location Istanbul / TURKEY
    Client

    Prota Eng. Prj. and Consultancy Serv. Co.

    Design Code

    AASHTO-LRFD 2016 (with 2016 Interims) & FHWA-IF-02-034 & ASTM D1143/D1143M (2013)

    Scope of Sabiha Gökçen Airport 2. Runway 1. Phase Geotechnical Works includes, cut slopes, which will be excavated up to 230ft height with conventional method and 3 tunnels with total length of 13.460ft